CLICK HERE FOR THOUSANDS OF FREE BLOGGER TEMPLATES »

Wednesday, September 10, 2008

kicha


There done! I finally finished my house project on our new golf course on the rez. It took almost a year because the materials go dorment in the winter and the water comp. mows the washes where it grows every fall. I bilt a total of 10 using 3 different traditional materials. The first 2 pictures are 2 mule's fat and 1 willow house.

these last pics show the frames i made and 1 tule house. 


now for eveyone who could not understand when i tried to explain what i do this will help.

rhino


This is our rhino upright


This is after Joey was backing up "SLOWLY" and it tip over!

When he came walking back to the shop I knew right away what happened. Then he said "I was just backing up and it tipped over" YA right! I walked out there and there were tire marks all over were someone else must have been doing backwards 180's. Nice try Joey!

the drain pipe

i got this pipe from work for the kids to play with, i look out in the field and joey is walking across the field on top of it. than him and his friend are taking turn inside why the other pushes. i was out in back of the shop and when i came back the pipe was in the shop and joey was fabricating handles for the inside of it to help him stay in place while rolling.